Client:
Downer Australia
Duration:
2 years
Project Overview:
A major expansion to the existing open cut mine and overhaul of the existing underground mine. Conducted by Downer Australia
Completed works:
- Structural grouting to all over land structures, including conveyers, stackers, sizing stations, crushing stations, reclaim tunnels load in and load out stations and CHPP areas.
- Concrete repairs and remediation to existing structures within the operation of the underground mine
- Concrete repairs and remediation to damaged or faulty newly built concrete structures
- Joint sealing in reclaim tunnels, sumps, conveyer gantries and in the CHPP
- Waterproofing systems to the external of the reclaim tunnels, sumps and pits.
- Waterproofing systems to the reclaim coal valves
- Waterproofing and fire rating to all electrical conduit penetrations throughout the site
- Technical consultation, product recommendations and sales throughout the project.